IQ Winter 2012 - (Page 10)

2012 NAtIoNAl DesIgN-BuIlD AwArD wINNers// The Goose Creek Correctional Center project is a stellar example of the benefits of the design-build process. The Neeser Construction, Inc. (NCI) team takes pride in the level of owner satisfaction, its safety record, the quality of the facility, and its ability to stay on budget and schedule. NCI is equally proud of its all-in application and management of the design-build process. From start to finish and top to bottom, the project succeeded through a collaborative, cooperative effort on the part of every stakeholder. Correctional Facilities National Design-Build Award goose creek correctIoNAl ceNter wAsIllA, AlAskA Owner: Matanuska-Susitna Borough Operator: State of Alaska Department of Corrections Design-Builder: Neeser Construction, Inc. Architect: KPB, Inc. Engineers: DOWL HKM, Engineering & Development Services, Coffman Engineers, Buford Goff & Associates, Inc. and Hargis Engineers Specialty Consultants: Hellmuth, Obata + Kassabaum, Inc., Durrant Justice, William Caruso & Associates, Contract Hardware, Inc., The Fire Consultants and EMC Engineers, Inc. Specialty Contractors: Superior Group, ALCAN Electrical & Engineering, Inc., Engineered Control Systems, CML Specialties, Acme Fence, Universal Roofing and Refrigeration & Food Equipment, Inc. Other Key Professionals: RISE Alaska, Alaska Planning and Architecture, Steve Fishback Architect, Tryck Nyman Hayes, Inc., Support Services of Alaska, Craig Unger, Ed Wundram, Bruce Mattson PE, ACSI, Inc. and Estimations, Inc. Educational Facilities National Design-Build Award herItAge hAll peNsAcolA, flA. Owner: University of West Florida Design-Builder, Architect and Engineer: Haskell Specialty Contractor: KD Construction of Florida, Inc. Heritage Hall is a 78,400-square-foot design-build student housing project on the University of West Florida’s main campus in Pensacola, Fla. As part of the campus master plan, the two-acre site included infrastructure to support not only Heritage Hall, but a future building, Presidents Hall. While the owner mandated LEED® Silver certification, the team went the extra mile and secured LEED Gold certification for the project. 10 winter//2012 the quarterly publication of the design-build institute of america

Table of Contents for the Digital Edition of IQ Winter 2012

IQ Winter 2012

IQ Winter 2012 - (Page Cover1)
IQ Winter 2012 - (Page Cover2)
IQ Winter 2012 - (Page 1)
IQ Winter 2012 - (Page 2)
IQ Winter 2012 - (Page 3)
IQ Winter 2012 - (Page 4)
IQ Winter 2012 - (Page 5)
IQ Winter 2012 - (Page 6)
IQ Winter 2012 - (Page 7)
IQ Winter 2012 - (Page 8)
IQ Winter 2012 - (Page 9)
IQ Winter 2012 - (Page 10)
IQ Winter 2012 - (Page 11)
IQ Winter 2012 - (Page 12)
IQ Winter 2012 - (Page 13)
IQ Winter 2012 - (Page 14)
IQ Winter 2012 - (Page 15)
IQ Winter 2012 - (Page 16)
IQ Winter 2012 - (Page 17)
IQ Winter 2012 - (Page 18)
IQ Winter 2012 - (Page 19)
IQ Winter 2012 - (Page 20)
IQ Winter 2012 - (Page 21)
IQ Winter 2012 - (Page 22)
IQ Winter 2012 - (Page 23)
IQ Winter 2012 - (Page 24)
IQ Winter 2012 - (Page Cover3)
IQ Winter 2012 - (Page Cover4)
https://www.nxtbookmedia.com