IQ Spring 2013 - (Page 8)

Water/WasteWater//state oF the seCtor Construction proceeds on the sediment removal basins (foreground) and clearwell structure (left), where the final steps in treatment occur. an eye toWard oPerations The board relied on the experience and expertise of the joint venture partners to improve and expand upon the scope of the initial plan. Throughout the process, the CH2M HILL/Western Summit team proposed solutions that cut initial and life-cycle costs, reducing the project’s time frame, and simplifying construction and long-term operations over the design specified in the RFP. Open communication came into play again during construction. With the team managing multiple job sites, efficiency and time management were crucial to maintaining a tight schedule. Open communication between the design-build team and the owner was also important during commissioning and start-up. CH2M HILL and Western Summit operated the facility for the first three months prior to the formal acceptance test, allowing the team to fine-tune systems and 8 spring//2013 optimize operations. During this three-month period, the newly hired operating staff shadowed the design-build team members, learning how to operate the Buckman facilities from those already familiar with them. The project came in early and is currently delivering more than 70 percent of Santa Fe’s annual water supply—15 million gallons daily takeaWays: Constant and open communication was crucial to the success of the project and the owner’s satisfaction. Representing stakeholders, the Buckman Direct Diversion Board and its design-build partner, the CH2M HILL/Western Summit Constructors Joint Venture, achieved its goal—delivering potable water to Santa Fe and the surrounding county. the quarterly publication of the design-build institute of america

Table of Contents for the Digital Edition of IQ Spring 2013

IQ Spring 2013

IQ Spring 2013 - (Page Cover1)
IQ Spring 2013 - (Page Cover2)
IQ Spring 2013 - (Page 1)
IQ Spring 2013 - (Page 2)
IQ Spring 2013 - (Page 3)
IQ Spring 2013 - (Page 4)
IQ Spring 2013 - (Page 5)
IQ Spring 2013 - (Page 6)
IQ Spring 2013 - (Page 7)
IQ Spring 2013 - (Page 8)
IQ Spring 2013 - (Page 9)
IQ Spring 2013 - (Page 10)
IQ Spring 2013 - (Page 11)
IQ Spring 2013 - (Page 12)
IQ Spring 2013 - (Page 13)
IQ Spring 2013 - (Page 14)
IQ Spring 2013 - (Page 15)
IQ Spring 2013 - (Page 16)
IQ Spring 2013 - (Page 17)
IQ Spring 2013 - (Page 18)
IQ Spring 2013 - (Page 19)
IQ Spring 2013 - (Page 20)
IQ Spring 2013 - (Page Cover3)
IQ Spring 2013 - (Page Cover4)
http://staging.nxtbook.com/ygsreprints/DBIA/g32384_dbia_spring2013
http://staging.nxtbook.com/ygsreprints/DBIA/g30201_dbia_winter2012
http://staging.nxtbook.com/ygsreprints/DBIA/g27498_dbia_iq_fall2012
http://staging.nxtbook.com/ygsreprints/DBIA/g27263_dbia_iq_summer2012
http://staging.nxtbook.com/ygsreprints/DBIA/g27412dbia_iq_spr12
http://staging.nxtbook.com/ygsreprints/DBIA/g24065_dbiaiqwinter11
http://staging.nxtbook.com/ygsreprints/DBIA/g21862_dbia_fall_11
http://staging.nxtbook.com/ygsreprints/DBIA/dbianxtbook_summer_11
http://staging.nxtbook.com/ygsreprints/DBIA/g18240_dbia_spring2011a
http://www.nxtbookMEDIA.com